Skip to main content
CourtGPT logoCourtGPT
Directory
Law
For Attorneys
Blog
AppointmentsSign InSign Up
Section 19-11-1206 - Guaranteed energy cost savings contract requirements — Arkansas Law | CourtGPT
  1. Home/
  2. Laws/
  3. Arkansas/
  4. Title 19 - Public Finance (§§ 19-1-201 — 19)/
  5. Chapter 11 - Purchasing and Contracts Sub/
  6. Subchapter 12 - Guaranteed Energy Cost Savings Act/
  7. Section 19-11-1206 - Guaranteed energy cost savings contract requirements
Arkansas Legal Code

Section 19-11-1206 - Guaranteed energy cost savings contract requirements

Ask AI about this
(a) The following provisions are required in a guaranteed energy cost savings contract: (1) A statement that the state agency shall maintain and operate the energy cost savings measures as defined in the guaranteed energy cost savings contract; and(2) A guarantee by the qualified provider that:(A) The energy cost savings and operational cost savings to be realized over the term of the guaranteed energy cost savings contract meet or exceed the costs of the energy cost savings measures; and(B) If the annual energy or operational cost savings fail to meet or exceed the annual costs of the energy cost savings measure as required by the guaranteed energy cost savings contract, the qualified provider shall reimburse the state agency for any shortfall of guaranteed energy cost savings over the term of the guaranteed energy cost savings contract.(b)(1) If a guaranteed energy cost savings contract includes energy cost savings measures that possess either an active equipment warranty period or a combined useful life in excess of twenty (20) years, a guaranteed energy cost savings contract may be extended to the length of the: (A) Equipment warranty period; or(B) Weighted useful life of the

a combined useful life in excess of twenty (20) years, a guaranteed energy cost savings contract may be extended to the length of the: (A) Equipment warranty period; or(B) Weighted useful life of the relevant energy cost savings measures.(2) A guaranteed energy cost savings contract shall not exceed twenty (20) years without approval of the Arkansas Energy Office of the Division of Environmental Quality.(c) Before entering into a guaranteed energy cost savings contract, the state agency shall require the qualified provider to file with the state agency a payment and performance bond or similar assurance as provided under § 19-11-235.Amended by Act 2019, No. 507,§ 4, eff. 7/24/2019.Amended by Act 2013, No. 554,§ 6, eff. 8/16/2013.Acts 2005, No. 1761, § 1.