Notwithstanding federal regulations, the board and the department shall adopt rules under section 1 of this chapter that require the applicant for a vertical expansion of an existing permitted landfill to submit design, engineering, and operational requirements, including the following:(1) A more precise definition of the hydrogeology of the site, including a soil gas analysis.(2) Operational requirements.(3) Surface water control plan.(4) Landfill gas control plan.(5) Final cover requirements.(6) Closure and financial assurance plans.(7) Remedial action plan.[Pre-1996 Recodification Citation: 13-1-12-9(d).]As added by P.L.1-1996, SEC.9.
Indiana Legal Code