(2) Consider whether the project is practicable and is of public need.(3) File a report within ten (10) days from the time of the inspection. The opinion of the majority prevails.[Pre-1995 Recodification Citation: 13-2-18-7 part.]As added by P.L.1-1995, SEC.19.
Indiana Legal Code