(a) Before the public utility or the qualified provider may install equipment in, make modifications to, or remodel a building or complex of buildings under a utility efficiency program or a guaranteed savings contract, the public utility or the qualified provider (whichever applies) must issue a report that includes estimates for the following:(1) All costs attributable to the work stipulated in the agreement or the contract, including the costs of design, engineering, installation, maintenance, repairs, or debt service.(2) The amounts by which:(A) energy or water consumption;(B) wastewater costs; or(C) operating costs;will be reduced.(3) The amounts by which billable revenues will be increased.(b) The report must also contain a listing of contractors and subcontractors to be used by the public utility or the qualified provider with respect to the conservation measures.As added by P.L.24-1993, SEC.6. Amended by P.L.168-2006, SEC.14.
Indiana Legal Code