The deliverables required for a qualitative proposal in a request for proposals may not exceed the following, as considered appropriate for the type of project by the technical review committee for the public project:(1) All information requested in the design criteria package.(2) A conceptual site plan.(3) Conceptual building, systems, and equipment plans.(4) Conceptual elevations.(5) A project description narrative.(6) A project schedule.As added by P.L.166-2011, SEC.9.
Indiana Legal Code