  6. Chapter 42 - Default Standards for Commercial Solar Energy Systems8-1-42-1. Applicability; "Solar Energy Ready Community"/
  7. § 8-1-42-13
Indiana Legal Code

§ 8-1-42-13

Ask AI about this
5) kilovolts that are located between inverter locations and project substations shall be located and maintained underground, as feasible. Other solar infrastructure, such as module-to-module collection cables, transmission lines, substations, junction boxes, and other typical aboveground infrastructure may be located and maintained above ground. Buried cables shall be at a depth of at least thirty-six (36) inches below grade or, if necessitated by onsite conditions, at a greater depth. Cables and lines located outside of the CSE system project site may:(1) be located above ground; or(2) in the case of cables or lines of up to thirty-four and one-half (34.5) kilovolts, be buried underground at:(A) a depth of at least forty-eight (48) inches below grade, so as to not interfere with drainage tile or ditch repairs; or(B) another depth, as necessitated by conditions;as determined in consultation with the landowner.As added by P.L.90-2022, SEC.2.