(b) The department may purchase not more than four (4) worksite speed control systems under the pilot program.(c) The department may operate and monitor not more than four (4) worksites in a single calendar year.(d) Before installing a worksite speed control system, the department shall do the following:(1) Conduct a public information campaign to inform drivers about the use of a worksite speed control system to detect speeds in excess of a worksite speed limit.(2) Post signs indicating that worksite speed limits are monitored by a worksite speed control system before the entrance to a worksite in which a worksite speed control system is in use.As added by P.L.120-2023, SEC.2.
Indiana Legal Code