Skip to main content
CourtGPT logoCourtGPT
Directory
Law
For Attorneys
Blog
AppointmentsSign InSign Up
§ 572-13b — Iowa Law | CourtGPT
  1. Home/
  2. Laws/
  3. Iowa/
  4. Title XIV - Property/
  5. Chapter 572 - Mechanic’s Lien/
  6. § 572-13b
Iowa Legal Code

§ 572-13b

Ask AI about this
572.13B Preliminary notice — subcontractor — residential construction. 1. A subcontractor shall post a preliminary notice to the mechanics’ notice and lien registry internet site. A preliminary notice posted before the balance due is paid to thegeneral contractor or the owner-builder is effective as to all labor, service, equipment, andmaterial furnished to the property by the subcontractor. The preliminary notice shall containall of the following information: a. The name of the owner.b. The mechanics’ notice and lien registry number.c. The name, address, and telephone number of the subcontractor furnishing the labor, service, equipment, or material. d. The name and address of the person who contracted with the claimant for the furnishing of the labor, service, equipment, or material. e. The name of the general contractor or owner-builder under which the claimant is performing or will perform the work. f. The address of the property or a description of the location of the property if the property cannot be reasonably identified by an address. g. The legal description that adequately describes the property to be charged with the lien.h.

scription of the location of the property if the property cannot be reasonably identified by an address. g. The legal description that adequately describes the property to be charged with the lien.h. The date the material or materials were first furnished or the labor was first performed.i. The tax parcel identification number.j. Any other information required by the administrator pursuant to rule.2. At the time a preliminary notice is posted to the mechanics’ notice and lien registry internet site, the administrator shall send notification to the owner, including the owner noticedescribed in section 572.13, subsection 1, and shall post the mailing of the notice on themechanics’ notice and lien registry internet site as prescribed by the administrator pursuantto rule. Notices under this section shall not be sent to owner-builders. Upon request, theadministrator shall provide proof of service at no cost for the notice required under thissection. 3. a. A mechanic’s lien perfected under this chapter is enforceable only to the extent of the balance due the general contractor or the owner-builder at the time of the posting of thepreliminary notice specified in subsection 1, and, except

his chapter is enforceable only to the extent of the balance due the general contractor or the owner-builder at the time of the posting of thepreliminary notice specified in subsection 1, and, except for residential construction propertyowned by an owner-builder, also is enforceable only to the extent of the balance due thegeneral contractor at the time the owner actually receives the notice provided pursuant tosubsection 2 or paragraph 'b'. b. (1) In any action to enforce a mechanic’s lien perfected under this chapter against the owner, the subcontractor bears the burden to prove by a preponderance of the evidence thatthe owner received notice pursuant to subsection 2. A subcontractor may satisfy the burdenof proof by providing separate notice to an owner by including but not limited to any of thefollowing means: (a) By certified mail with return receipt.(b) By personal service in the manner original notices are required to be served.(c) By actual notice with a signed receipt from the owner acknowledging notice.(2) If the subcontractor provides an affidavit of mailing, the presumption is that the owner received the notice on the fourth day of business for the post office after

the owner acknowledging notice.(2) If the subcontractor provides an affidavit of mailing, the presumption is that the owner received the notice on the fourth day of business for the post office after the notice was sentand the burden of proof shifts from the subcontractor to the owner to refute the presumption. 4. A subcontractor who fails to post a preliminary notice pursuant to this section shall not be entitled to a lien and remedy provided under this chapter. 5. This section applies only to residential construction properties.2012 Acts, ch 1105, §10, 27, 28; 2012 Acts, ch 1138, §13, 41, 43; 2013 Acts, ch 90, §257; 2013 Acts, ch 99, §6, 7; 2014 Acts, ch 1092, §127 Referred to in §572.8, 572.13A, 572.14, 572.16, 572.18, 572.34 Sat Dec 23 11:07:51 2023 Iowa Code 2024, Section 572.13B (25, 0)