572.14 Liability to subcontractor after payment to general contractor or owner-builder. Except as provided in section 572.13B, payment to the general contractor or owner-builder of any part or all of the contract price of the building or improvement within ninety daysafter the date on which the last of the materials was furnished or the last of the labor wasperformed by a subcontractor, does not relieve the owner from liability to the subcontractorfor the full value of any material furnished or labor performed upon the building, land, orimprovement if the subcontractor posts a lien within ninety days after the date on which thelast of the materials was furnished or the last of the labor was performed. [S13, §3093; C24, 27, 31, 35, 39, §10283; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81, §572.14; 81 Acts, ch 186, §2] 87 Acts, ch 79, §6; 98 Acts, ch 1142, §3; 2007 Acts, ch 83, §10; 2012 Acts, ch 1105, §11, 27, 28; 2012 Acts, ch 1138, §13 Sat Dec 23 11:07:52 2023 Iowa Code 2024, Section 572.14 (24, 0)
Iowa Legal Code