Skip to main content
CourtGPT logoCourtGPT
Directory
Law
For Attorneys
Blog
AppointmentsSign InSign Up
§ 224-46-016 — Kentucky Law | CourtGPT
  1. Home/
  2. Laws/
  3. Kentucky/
  4. Chapter 224 - Environmental Protection/
  5. Subchapter 224 46/
  6. § 224-46-016
Kentucky Legal Code

§ 224-46-016

Ask AI about this
224.4 6-016 Fees for permit to construct or operate hazardous waste treatment, storage, or disposal facility. (1) An applicant for a permit to construct or operate a hazardous waste treatment, storage, or disposal facility shall be subject to a filing fee by t he cabinet in the amount of twenty percent (20%) of the permit review fee. (2) An applicant for a permit to construct or operate a treatment, storage, or disposal facility shall be subject by the cabinet to a review fee equal to the sum of the unit fees ch arged for each type of hazardous waste management unit at the facility. The incinerator unit fee shall apply once for each different type of incinerator unit at the facility. The types of incinerator units shall include liquid injection, rotary kiln, fluid ized bed, and multiple hearth. The tank unit fee shall apply once for each different tank design. Tank design criteria shall include: differences in materials of construction, pressure vessels, nonpressure vessels, shape, and ancillary equipment. The conta iner unit fee shall apply once for each different container type. Container types shall include: drums, tote bins, bottles, and roll -off boxes.

ure vessels, shape, and ancillary equipment. The conta iner unit fee shall apply once for each different container type. Container types shall include: drums, tote bins, bottles, and roll -off boxes. The unit fees shall be: (a) Incinerator: nineteen thousand four hundred dollars ($19,400); (b) Waste pile: twelv e thousand two hundred dollars ($12,200); (c) Surface impoundment: fourteen thousand dollars ($14,000); (d) A tank with a total capacity of seven thousand five hundred (7,500) or more gallons: seven thousand four hundred dollars ($7,400); (e) A tank with a total capacity less than seven thousand five hundred (7,500) gallons: three thousand seven hundred dollars ($3,700); (f) Additional tanks of similar design with a combined capacity greater than seven thousand five hundred (7,500) gallons: four thousand fo ur hundred dollars ($4,400); (g) Additional tanks of similar design with a combined capacity less than seven thousand five hundred (7,500) gallons: one thousand eight hundred fifty dollars ($1,850); (h) A container with a total capacity of five thousand (5 ,000) or more gallons: six thousand dollars ($6,000); (i) A container with a total capacity less than five thousand

d fifty dollars ($1,850); (h) A container with a total capacity of five thousand (5 ,000) or more gallons: six thousand dollars ($6,000); (i) A container with a total capacity less than five thousand (5,000) gallons: three thousand dollars ($3,000); (j) Additional container of similar design with a combined capacity greater than five thou sand (5,000) gallons: three thousand dollars ($3,000); (k) Additional container of similar design with a combined capacity less than five thousand (5,000) gallons: one thousand five hundred dollars ($1,500); (l) Land treatment: fifteen thousand eight hundr ed dollars ($15,800); and (m) Landfill: fifteen thousand dollars ($15,000). (3) The cabinet may subject an applicant seeking a permit to construct or operate a treatment, storage, or disposal facility to a facility assessment fee as follows: (a) One hundred (100) or more solid waste management units: eleven thousand five hundred dollars ($11,500); (b) Sixty (60) to ninety -nine (99) solid waste management units: nine thousand dollars ($9,000); (c) Twenty (20) to fifty -nine (59) solid waste manageme nt units: six thousand five hundred dollars ($6,500); or (d) Fewer than twenty (20) solid waste

agement units: nine thousand dollars ($9,000); (c) Twenty (20) to fifty -nine (59) solid waste manageme nt units: six thousand five hundred dollars ($6,500); or (d) Fewer than twenty (20) solid waste management units: four thousand dollars ($4,000). (4) The cabinet may require an applicant seeking a permit to construct or operate a treatment, storage, or dis posal facility to submit an investigation fee or corrective action fee, or both, if the facility includes a facility investigation or corrective action study or plan. The facility investigation fee shall be equal to the cost of the review, but shall not ex ceed fourteen thousand five hundred dollars ($14,500). The corrective action fee shall be equal to the cost of the review, but shall not exceed twenty -nine thousand dollars ($29,000). Effective: July 13, 1990 History: Created 1990 Ky. Acts ch. 471, sec. 4, effective July 13, 1990. Formerly codified as KRS 224.1161.