Skip to main content
CourtGPT logoCourtGPT
Directory
Law
For Attorneys
Blog
AppointmentsSign InSign Up
Section 4-211 - Energy Generating Systems — Maryland Law | CourtGPT
  1. Home/
  2. Laws/
  3. Maryland/
  4. Land Use - Division I - Single-jurisdiction Planning and Zoning/
  5. Division I - Single-jurisdiction Planning and Zoning/
  6. Title 4 - Zoning/
  7. Subtitle 2 - Designation and Adoption/
  8. Section 4-211 - Energy Generating Systems
Maryland Legal Code

Section 4-211 - Energy Generating Systems

Ask AI about this
(a) In this section, 'energy generating system' means an energy generating system: (1) for which a certificate of public convenience and necessity is required by State law; or (2) (i) for which a certificate of public convenience and necessity is not required by State law; and (ii) that is not considered to be an accessory use under the zoning law of the local jurisdiction where the system is located. (b) If the primary reason for a proposed amendment to change a zoning classification on a parcel of land is the existence of an energy generating system on that parcel of land or on a parcel of land that is adjacent to or in close proximity to that parcel of land, a legislative body may not grant an amendment to change the zoning classification based on a finding that there was: (1) a substantial change in the character of the neighborhood where the property is located; or (2) a mistake in the existing zoning classification.