§ 69-3-714

Ask AI about this
69-3-714. Criteria for allowable advanced conductor programs. (1) The commission may approve cost-effectiveness criteria for advanced conductor projects that may be placed into a utility's rate base under this part. (2) Criteria must be based on established direct current resistance at standard pressure and a temperature of 20 degrees Celsius. (3) As used in this section, 'advanced conductor' means an overhead electricity conductor installed in a transmission or distribution project that has a direct current electrical resistance at least 10% lower than existing conductors of a similar diameter on the system. (4) In establishing cost-effectiveness criteria, the commission may consider decreased electrical losses and any other relevant consumer, environmental, and system benefits provided by advanced conductors. History: En. Sec. 1, Ch. 535, L. 2023.

Source: https://mca.legmt.gov/bills/mca/title_0690/chapter_0030/part_0070/section_0140/0690-0030-0070-0140.html· Version 2025