Statute 278 0195

Ask AI about this
'Utility project' means: 1. An electric transmission line which is designed to operate at 200 kilovolts or more; or 2. A line used to transport natural gas which operates at 20 percent or more of the specified minimum yield strength of the material from which the line is constructed, which has been approved for construction after October 1, 1991, by the State or Federal Government or a governing body. (Added to NRS by 1993, 2558)