RCW 18.104.049Modification of construction standards.The department by rule shall adopt procedures to permit a well operator to modify construction standards to meet unforeseen circumstances encountered during the construction of a well. The procedures shall be developed in consultation with the technical advisory group established in RCW 18.104.190.[ 1993 c 387 s 7.]
Washington Legal Code